Community and customer portal
  • OneSpan.com
  • Support
    • Documentation portal
    • TrustCenter
    • Customer support
Community and customer portal
Toggle navigation
  • Products
  • Code shares
  • Interactive APIs
  • Developer sandbox
  • Developer sandbox
  • Forums
  • Demos

User account menu

  • Sign up
  • Login
  1. Home
  2. Search

Search

1404 results matched your search criteria
Can I move a Package out of Draft Status without re-sending the Package?
Forum topic
OneSpan Sign
Here is the scenario. I need to change the Expiration Date of several packages that are about to expire out 30 Days.
Setting ExpiryDate to null
Forum topic
OneSpan Sign
Hi, I'm having issues setting the expiration date to null. These are the functions I'm calling: EslClient eslClient = getEslClient(companyId); PackageId pkgId = new PackageId(packageId); DocumentPackage dp = eslClient.GetPackage(pkgId); dp.ExpiryDate = null; eslClient.UpdatePackage(pkgId, dp); Af
Two ways to change status to DRAFT?
Forum topic
OneSpan Sign
I was successfully able to change my package status to DRAFT by using the code supplied in your guide.
Archiving Package with diferent Sigantures Types throws SDK EslException
Forum topic
OneSpan Sign
Hello there, I have an eSignLive integration, using the SDK v11, where I am able to Create& Send package for signing to: 1. Three Signers with corresponding "Click to Sign" signatures 2.
New Signing Experience Issue
Forum topic
OneSpan Sign
Is there a change in updatePackage call for new signing experience. I am able to generate the package and update the package with settings and roles from old signing experience account but same cannot be done with new signer experience account.
Changing the Expiration Date after a Customer has signed but before we Sign
Forum topic
OneSpan Sign
We would like to give the customer 15 days to sign the Document but then after they have signed to reset the Expiration Date to 90 days for us to counter-sign. In our business, the signature for a customer signifies that we will begin building the Fiber from our location to the customer site.
Unable to sign the package id (6IplFyll_4FoEedgSHG5hVCcvkY=)
Forum topic
OneSpan Sign
I have done following steps for the mentioned package, please let me know if there is issue with the steps, Step 1: package had created and sent with due date ‘2019-12-31T18:30:00Z’ Step 2 : I am Listening ‘PACKAGE_EXPIRE’ event and on package Expiry event I had update the package expiry date to
_x getting removed from package ID
Forum topic
OneSpan Sign
We noticed this morning that when a packageID contains _x something in the Apex SDK is removing it from the string.  We are passing in:
Change package expiry without sending email
Forum topic
Intelligent Adaptive Authentication
Hi, Is there a way to change the package expiry date without re-sending the invitation email? My current code is 
Creating a package that is available for signing without sending notifications
Forum topic
OneSpan Sign
Hi, Is it possible to create a package with status not draft and then notify a signer at a later point. I have a use case where some signers will need to click a link through an email in order to sign and others will click a link through our portal.
  • Load More
  • Home
  • Products
  • Documentación
  • Forums
  • Demos
OneSpan

Footer menu

  • Products
  • Forum
  • Demos
  • Contact Support
  • Documentation Portal
  • Trust Center

Follow us on:

  • Privacy Center
  • Cookie Policy
  • Terms of Use
  • Legal Notice
  • Preference Center

Copyright 2025 OneSpan. All Rights Reserved.